|
Posted by John on 12/20/07 01:08
On Sun, 16 Dec 2007 18:39:12 -0000, "Trev"
<trevbowdenAT.dsl.pipex.COM> wrote:
>John wrote:
>> Does anyone know if its possible to move a video file in NeroVision 3
>> so that it doesn't start at 00:00:00.00?
>>
>> So far I have added a video file to my project but when I try and drag
>> it further to the right on the timeline so it starts at about the 2:20
>> mark after all the opening titles have been shown, it wont let me move
>> it. Seems to be insisting that the video file starts at zero in the
>> timeline.
>>
>> If this is the case are there any work arounds for this limitation? I
>> was hoping I would be able to add a black image file into the video
>> time line and stretch that out for the first 2 minutes 20 seconds to
>> fill that void and then add my video file afterwards, but it doesn't
>> seem to allow you to add image files into the video timeline.
>>
>> Cheers for any suggestions
>>
>> John
>
>Add the titles in front of it and it will move to accommodate. Or do you
>mean menu
I had added a list of credits at the beginning which doesn't appear in
the video time line but in the text one above it. I had to export that
to DV and then reimport it so that it was in the video time line. I
think NeroVision wants the video to always start at zero and all video
clips to be together with no gaps.
Cheers
John
Navigation:
[Reply to this message]
|