Posted by ridewaves00 on 03/08/06 23:29
Hello, I am fairly new to Avid. I'm using Express DV to create a slide
show containing 400 jpegs. I've imported them at 7 seconds in length.
Now, I need to lay them on the timeline at 5 seconds in order to have
that extra 2 seconds free for transitions between each one. Is there a
way to perform this on all the pics at once, or do I have to manually
trim each one in the timeline?
Any help is greatly appreciated.
Brooks
[Back to original message]
|