|
Posted by Tech Geek on 01/18/06 23:40
Thank you very much for that information as well . . . I never realized
it took quite that much precision to get it to work well. I will
inform my boss (the prinipal) of the additional materials we will be
needing. I would prefer to have the job done right the first time.
Also, you mentioned "The excess length sweeps onto the floor, creating
a perfect limbo cove for your keying". It is actually better to leave
the excess fabric puddle onto the floor rather than cur it off when it
reaches the floor? Thanks again for all you help . . .I really do
appreciate it.
Navigation:
[Reply to this message]
|